After a fantastic couple of days bringing the steel to site and installing the classroom frames, the next task was to fix all the floor joists in place and drill holes into the ceiling beams ready to take the roofing structure.

Ironwood team drill holes into ceiling beams
Ironwood team drill holes into ceiling beams

A few of the pupils spent their lunchtime lending a hand and helping us to paint more of the steel sections for their new classroom. It was great to see their enthusiasm and eagerness to help out on site.

New Road pupil painting team
New Road pupil painting team

The local community arrived on site ready to work and decided to build a walkway from the current school building to the new classrooms. Travelling to the nearest place we could source bamboo, several of the parents cut down 15 pieces of bamboo and then split and stripped the bamboo. They used the bamboo as a replacement for a metal frame to go at the bottom of the base of the walkway in preparation for a concrete mixture to be poured on top.

Criss cross bamboo frame structure is created
Criss cross bamboo frame structure is created
Mixture of sand, gravel and cement is mixed to make concrete
Mixture of sand, gravel and cement is mixed to make concrete

It was fantastic to have the local communities support and assistance in the school project. Both the students and parents were keen to see the Ironwood team working and have the ability to share their different skill sets.

Ironwood team on site with school pupils
Ironwood team on site with school pupils

Next to be installed was the metal roof structure and finally the Shera board flooring material for the classroom floor.

Roof is installed
Roof is installed
Shera Board floor is installed
Shera Board floor is installed

It is great to see the classroom structure taking form on site at New Road, we cannot wait to see the pupils using their new classroom buildings.

Wall and floor are installed
Wall and floor are installed

I look forward to updating you with final pictures of Moving School 002 very soon.

Thanks for reading,

Louise

Advertisements

One thought on “The latest from Moving Schools 002”

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s